2026-06-22
Night โ€” Team B
TOTAL NDT OK
313
Units
TOTAL HC&FC REJECT
24
Units
H&F REJECTION %
6.80%
of total production
NDT REJECTION %
4.53%
of total production
DOWNTIME (min)
1,440
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-06-22
Shift:
Night
Supervisor:
OMAR
Team:
B
Total Attendance:
17
Total Absent:
3
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Casting EOT Crane Line Wire Medium Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
19.89
โš  Below minimum
-0.72 0.00 20.61 โ€”
HC
min: 24T
20.14
โš  Below minimum
-0.18 0.00 20.32 ADDING WHEELS
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running 640-17"-M2 85 7 4 96 11.5% 7.3% 4.2% โ€”
7 Running 640-17"-M1 95 5 2 102 6.9% 4.9% 2.0% โ€”
14 Running CV98-20-M2 39 7 4 50 22.0% 14.0% 8.0% โ€”
16 Running 640-16-M2 94 5 6 105 10.5% 4.8% 5.7% โ€”
TOTAL PRODUCTION 353 โ€”โ€”โ€”โ€”
TOTAL REJECTION 40 11.3% 6.8% 4.5% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
Sprue Drilling 4 Not Working Properly 720 min Checked but not rectified. โ€” โ€” Open โ€”
Forklift D2 Radiator Water Leaking 720 min โ€” โ€” โ€” Open โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-16" In Progress remaining Lower. Mold (require welding).