๐ Recent Shifts โ quick switch
Date & Shift
2026-06-22
Night โ Team B
TOTAL HC&FC REJECT
24
Units
H&F REJECTION %
6.80%
of total production
NDT REJECTION %
4.53%
of total production
| No | Observation | Status |
| 1 |
Casting EOT Crane Line Wire |
Medium Risk |
| Furnace |
Mass Received (Ton) |
Consumed (Ton) |
Metal Added (Ton) |
Mass End of Shift (Ton) |
Remarks |
| HA
min: 28T
|
19.89 โ Below minimum
|
-0.72 |
0.00 |
20.61 |
โ |
| HC
min: 24T
|
20.14 โ Below minimum
|
-0.18 |
0.00 |
20.32 |
ADDING WHEELS |
| SWM1
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM2
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| Stage | Condition | Comments |
| Received |
Good |
โ |
| Hand Over |
Good |
โ |
| M/C No. |
Status |
Mold Type |
NDT OK |
HC & FC Reject |
NDT Reject |
Total |
Rejection % |
H&F Rej % |
NDT Rej % |
Remarks |
| 6 |
Running |
640-17"-M2 |
85 |
7 |
4 |
96 |
11.5% |
7.3% |
4.2% |
โ |
| 7 |
Running |
640-17"-M1 |
95 |
5 |
2 |
102 |
6.9% |
4.9% |
2.0% |
โ |
| 14 |
Running |
CV98-20-M2 |
39 |
7 |
4 |
50 |
22.0% |
14.0% |
8.0% |
โ |
| 16 |
Running |
640-16-M2 |
94 |
5 |
6 |
105 |
10.5% |
4.8% |
5.7% |
โ |
| TOTAL PRODUCTION |
353 |
โ | โ | โ | โ |
| TOTAL REJECTION |
40 |
11.3% |
6.8% |
4.5% |
โ |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
| Sprue Drilling 4 |
Not Working Properly |
720 min |
Checked but not rectified. |
โ |
โ |
Open |
โ |
| Forklift D2 |
Radiator Water Leaking |
720 min |
โ |
โ |
โ |
Open |
โ |
| Die Model | Status | Remarks |
| 640-16" |
In Progress |
remaining Lower. Mold (require welding). |