Date & Shift
2026-06-23
Night โ Team B
TOTAL HC&FC REJECT
33
Units
H&F REJECTION %
6.38%
of total production
NDT REJECTION %
3.87%
of total production
| No | Observation | Status |
| 1 |
L16 more water vapor coming from the exhaust. |
Medium Risk |
| Furnace |
Mass Received (Ton) |
Consumed (Ton) |
Metal Added (Ton) |
Mass End of Shift (Ton) |
Remarks |
| HA
min: 28T
|
24.72 โ Below minimum
|
-7.08 |
0.00 |
31.80 |
โ |
| HC
min: 24T
|
16.20 โ Below minimum
|
-8.26 |
0.00 |
24.46 |
โ |
| SWM1
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM2
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| Stage | Condition | Comments |
| Received |
Good |
โ |
| Hand Over |
Good |
โ |
| M/C No. |
Status |
Mold Type |
NDT OK |
HC & FC Reject |
NDT Reject |
Total |
Rejection % |
H&F Rej % |
NDT Rej % |
Remarks |
| 5 |
Running |
640-15"-4H |
41 |
6 |
2 |
49 |
16.3% |
12.2% |
4.1% |
โ |
| 6 |
Running |
640-17-M2 |
93 |
5 |
2 |
100 |
7.0% |
5.0% |
2.0% |
โ |
| 7 |
Running |
640-17-M1 |
87 |
6 |
6 |
99 |
12.1% |
6.1% |
6.1% |
โ |
| 14 |
Running |
CV98-20" |
67 |
5 |
2 |
74 |
9.5% |
6.8% |
2.7% |
โ |
| 15 |
Running |
640-16-M1 |
81 |
6 |
8 |
95 |
14.7% |
6.3% |
8.4% |
โ |
| 16 |
Running |
640-16-M2 |
95 |
5 |
0 |
100 |
5.0% |
5.0% |
0.0% |
โ |
| TOTAL PRODUCTION |
517 |
โ | โ | โ | โ |
| TOTAL REJECTION |
53 |
10.3% |
6.4% |
3.9% |
โ |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
| โ No breakdowns recorded โ |
| Die Model | Status | Remarks |
| Style 55 1570 |
Completed |
Oil |