๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-06-23
Night โ€” Team B
TOTAL NDT OK
464
Units
TOTAL HC&FC REJECT
33
Units
H&F REJECTION %
6.38%
of total production
NDT REJECTION %
3.87%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-06-23
Shift:
Night
Supervisor:
OMAR
Team:
B
Total Attendance:
18
Total Absent:
2
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 L16 more water vapor coming from the exhaust. Medium Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
24.72
โš  Below minimum
-7.08 0.00 31.80 โ€”
HC
min: 24T
16.20
โš  Below minimum
-8.26 0.00 24.46 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
5 Running 640-15"-4H 41 6 2 49 16.3% 12.2% 4.1% โ€”
6 Running 640-17-M2 93 5 2 100 7.0% 5.0% 2.0% โ€”
7 Running 640-17-M1 87 6 6 99 12.1% 6.1% 6.1% โ€”
14 Running CV98-20" 67 5 2 74 9.5% 6.8% 2.7% โ€”
15 Running 640-16-M1 81 6 8 95 14.7% 6.3% 8.4% โ€”
16 Running 640-16-M2 95 5 0 100 5.0% 5.0% 0.0% โ€”
TOTAL PRODUCTION 517 โ€”โ€”โ€”โ€”
TOTAL REJECTION 53 10.3% 6.4% 3.9% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
Style 55 1570 Completed Oil
โœ๏ธ Start a New Report