๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-06-28
Day โ€” Team B
TOTAL NDT OK
452
Units
TOTAL HC&FC REJECT
32
Units
H&F REJECTION %
6.43%
of total production
NDT REJECTION %
2.81%
of total production
DOWNTIME (min)
1,380
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-06-28
Shift:
Day
Supervisor:
OMAR
Team:
B
Total Attendance:
15
Total Absent:
5
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 5-ton Forklift Radiator Fan Belt Broke. Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
19.57
โš  Below minimum
2.47 0.00 17.10 โ€”
HC
min: 24T
27.48 4.40 0.00 23.08 6.1-ton Transferred
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
5 Running RPM444-17" 60 7 1 68 11.8% 10.3% 1.5% โ€”
6 Running 640-17"-M2 97 9 5 111 12.6% 8.1% 4.5% โ€”
7 Running 640-17"-M1 97 5 3 105 7.6% 4.8% 2.9% โ€”
15 Running 640-16-M1 99 6 3 108 8.3% 5.6% 2.8% โ€”
16 Running 640-16-M2 99 5 2 106 6.6% 4.7% 1.9% โ€”
TOTAL PRODUCTION 498 โ€”โ€”โ€”โ€”
TOTAL REJECTION 46 9.2% 6.4% 2.8% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
Forklift D1 AC 720 min T.B.D โ€” Maintenance Team In Progress โ€”
FORKLIFT 5.TON FAN BELT 660 min BELT REPLACED ADDING BLOKS & WHHELS, INCREASE PRODUCTION. โ€” Closed โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-15" Completed (OIL)
โœ๏ธ Start a New Report