๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-06-30
Night โ€” Team B
TOTAL NDT OK
267
Units
TOTAL HC&FC REJECT
26
Units
H&F REJECTION %
8.41%
of total production
NDT REJECTION %
5.18%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-06-30
Shift:
Night
Supervisor:
OMAR
Team:
B
Total Attendance:
15
Total Absent:
5
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 H.T site coolers not working properly. Medium Risk
2 D2 Forklift stopping randomly High Risk
3 HA Furnace internal wall / lining damaged and need to be serviced ASAP. High Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
18.30
โš  Below minimum
-8.15 0.00 26.45 Received without the Pump.
HC
min: 24T
28.79 7.43 0.00 21.36 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good No Metal Transfer due to HA pump Failure in previous shift.
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Stopped 777-17"-5H 80 7 0 87 8.1% 8.1% 0.0% Target Over
6 Running 640-17"-M1 70 9 3 82 14.6% 11.0% 3.7% โ€”
7 Running 640-17"-M2 78 4 9 91 14.3% 4.4% 9.9% โ€”
15 Running 666-18"-5H 39 6 4 49 20.4% 12.2% 8.2% โ€”
TOTAL PRODUCTION 309 โ€”โ€”โ€”โ€”
TOTAL REJECTION 42 13.6% 8.4% 5.2% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
444-17"-5H Not Completed remaining Lower. Mold (require welding).
๐Ÿ“
ADDITIONAL REMARKS

The Melting Department needs immediate attention, especially the HA furnace due to its very poor internal wall condition. In addition, both enclosed forklifts are in poor condition: D1 is completely out of service, while D2 suffers from random stoppages during operation.

โœ๏ธ Start a New Report