Date & Shift
2026-07-14
Day โ€” Team B
TOTAL NDT OK
151
Units
TOTAL HC&FC REJECT
33
Units
H&F REJECTION %
14.86%
of total production
NDT REJECTION %
17.12%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-14
Shift:
Day
Supervisor:
OMAR
Team:
B
Total Attendance:
12
Total Absent:
8
Was the Lean Meeting conducted?:
Yes
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
24.67
โš  Below minimum
1.27 0.00 23.40 โ€”
HC
min: 24T
21.10
โš  Below minimum
-3.34 0.00 24.44 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Stopped 640-17"-M1 60 8 7 75 20.0% 10.7% 9.3% โ€”
6 Stopped 640-17"-M2 20 5 6 31 35.5% 16.1% 19.4% โ€”
7 Stopped BORO 18" 46 9 11 66 30.3% 13.6% 16.7% โ€”
14 Stopped R69-18"-ET-25-35 15 5 4 24 37.5% 20.8% 16.7% โ€”
16 Stopped R62-18"-45.52 10 6 10 26 61.5% 23.1% 38.5% โ€”
TOTAL PRODUCTION 222 โ€”โ€”โ€”โ€”
TOTAL REJECTION 71 32.0% 14.9% 17.1% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
777-17" Completed โ€”
๐Ÿ“
ADDITIONAL REMARKS

All machines getting rejected (R/S).