๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-05-28
Night โ€” Team A
TOTAL NDT OK
101
Units
TOTAL HC&FC REJECT
12
Units
H&F REJECTION %
10.26%
of total production
NDT REJECTION %
3.42%
of total production
DOWNTIME (min)
30
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-05-28
Shift:
Night
Supervisor:
Ahmed Ali Mohammed
Team:
A
Total Attendance:
8
Total Absent:
9
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 cables in die shop need to remove after use Closed
2 remove unwanted materials from the ground .. in casting Closed
3 drive way closed with objects - ( pallets ) need to located on other place to keep the rejected wheels Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
17.00
โš  Below minimum
-3.94 0.00 20.94 we add 5.8 ton rejected wheels
HC
min: 24T
0.00 0.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 25.20 -6.20 0.00 31.40 we add 3 blocks 3.5 ton
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable All covers are bad condition and some of it not available - need to do service for the launder --some of the supporter not support the launder
Hand Over Acceptable All covers are bad condition and some of it not available - need to do service for the launder - sone of the supporter not support the launder
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running 640-17" 82 7 2 91 9.9% 7.7% 2.2% โ€”
18 Running smx201-22 m4 19 5 2 26 26.9% 19.2% 7.7% โ€”
TOTAL PRODUCTION 117 โ€”โ€”โ€”โ€”
TOTAL REJECTION 16 13.7% 10.3% 3.4% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
conveyer conveyor not working between laser mark and X- ray 30 min repair done no maintenance team Closed yes
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
๐Ÿ“
ADDITIONAL REMARKS

ladles bad condition and not support the casting operation for more than 4 machine need to repair the others and keep spare . its hared to work at night with out coffee and in foundry no coffee machine working and admin building is closed . i really thanks all the employees come in Eid time and do the job to meet the company targets and i wish that they get thanks latter for the support .

โœ๏ธ Start a New Report