๐ Recent Shifts โ quick switch
Date & Shift
2026-05-31
Day โ Team D
TOTAL HC&FC REJECT
11
Units
H&F REJECTION %
22.92%
of total production
NDT REJECTION %
8.33%
of total production
| No | Observation | Status |
| 1 |
Forklift D3 in DM need urgent repair due to brake issue |
High Risk |
| 2 |
Melting D 4 Smoke coming from batteries |
Closed |
| Furnace |
Mass Received (Ton) |
Consumed (Ton) |
Metal Added (Ton) |
Mass End of Shift (Ton) |
Remarks |
| HA
min: 28T
|
23.00 โ Below minimum
|
-3.00 |
0.00 |
26.00 |
โ |
| HC
min: 24T
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM1
|
26.50 |
-2.50 |
0.00 |
29.00 |
โ |
| SWM2
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| Stage | Condition | Comments |
| Received |
Bad |
Blocked |
| Hand Over |
Bad |
Still Blocked |
| M/C No. |
Status |
Mold Type |
NDT OK |
HC & FC Reject |
NDT Reject |
Total |
Rejection % |
H&F Rej % |
NDT Rej % |
Remarks |
| 6 |
Stopped |
640-17" |
33 |
6 |
4 |
43 |
23.3% |
14.0% |
9.3% |
โ |
| 6 |
Standby |
SMX201-22"-M6 |
0 |
5 |
0 |
5 |
100.0% |
100.0% |
0.0% |
โ |
| TOTAL PRODUCTION |
48 |
โ | โ | โ | โ |
| TOTAL REJECTION |
15 |
31.3% |
22.9% |
8.3% |
โ |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
| Forklift D3 |
Brake issue |
720 min |
Reported |
NA |
Maintenance |
Open |
โ |
| Forklift D2 |
AC issue |
720 min |
Reported |
NA |
Maintenance |
Open |
โ |
| Die Model | Status | Remarks |
| 640-16" |
Not Completed |
Work pending due to forklift issue |