๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-07-27
Day โ€” Team D
TOTAL NDT OK
0
Units
TOTAL HC&FC REJECT
0
Units
H&F REJECTION %
0.00%
of total production
NDT REJECTION %
0.00%
of total production
DOWNTIME (min)
1,440
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-27
Shift:
Day
Supervisor:
Ali
Team:
D
Total Attendance:
12
Total Absent:
8
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
7
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 keep martials in incorrect location Low Risk
2 Conveyor rollers fall down in casting Low Risk
3 waste not taken to designated area in melting Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
17.43
โš  Below minimum
1.82 14.25 29.86 Crucible 13.2
HC
min: 24T
16.09
โš  Below minimum
3.33 1.82 14.58 Blocks make 3.334
SWM1 0.00 0.00 5.38 5.38 Added to start up
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable Damaged block for Lunder
Hand Over Acceptable Repaired Damaged part but required PH before use
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Stopped โ€” 0 0 0 0 0.0% 0.0% 0.0% HF Cleaning
14 Stopped โ€” 0 0 0 0 0.0% 0.0% 0.0% HF Cleaning
16 Stopped โ€” 0 0 0 0 0.0% 0.0% 0.0% HF Cleaning
TOTAL PRODUCTION 0 โ€”โ€”โ€”โ€”
TOTAL REJECTION 0 0% 0% 0% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 1 ๐Ÿ”ผ Machines Handed Over: 0
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
Melting Forklift Broken Glass 720 min Send to maintenance NA Maintenance In Progress โ€”
LPH Not running 720 min Reported NA Maintenance In Progress โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-15" Completed Done
640-16" M1 Completed Done
๐Ÿ“
ADDITIONAL REMARKS

Because of no strontium in melting work stopped HF cleaning done SWM 1 charging metal started

โœ๏ธ Start a New Report