๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-07-29
Day โ€” Team D
TOTAL NDT OK
19
Units
TOTAL HC&FC REJECT
2
Units
H&F REJECTION %
9.09%
of total production
NDT REJECTION %
4.55%
of total production
DOWNTIME (min)
960
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-29
Shift:
Day
Supervisor:
Ali
Team:
D
Total Attendance:
15
Total Absent:
5
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
4
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 wheels pallets putting on the forklift street in casting Low Risk
2 Forklift fill of chips and not clean in melting Medium Risk
3 keep martials in incorrect location Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
16.00
โš  Below minimum
0.00 0.00 16.00 โ€”
HC
min: 24T
30.80 4.32 0.00 26.48 โ€”
SWM1 22.40 0.00 10.20 32.60 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Bad Damaged block for Lunder
Hand Over Bad Repaired Damaged part but required PH before use
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17" 0 0 0 0 0.0% 0.0% 0.0% HF Cleaning
5 Stopped SMX201-22" 0 1 1 2 100.0% 50.0% 50.0% Stopped issue with machine
14 Running 640-16" 15 1 0 16 6.3% 6.3% 0.0% HF Cleaning
15 Running 640-15" 4 0 0 4 0.0% 0.0% 0.0% HF Cleaning
TOTAL PRODUCTION 22 โ€”โ€”โ€”โ€”
TOTAL REJECTION 3 13.6% 9.1% 4.5% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
Idex interlock with SWM 1 180 min Solved NA Maintenance Closed โ€”
LPH Not running 720 min Reported NA Maintenance โ€” โ€”
LPDC 14 DM water/ cooling zone 5 60 min Solved NA Maintenance Closed โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-16" Completed Done
640-17" M1 Not Completed LM pending
640-15" Completed 4H to 5H par code changed
โœ๏ธ Start a New Report