๐ Recent Shifts โ quick switch
Date & Shift
2026-06-01
Day โ Team D
TOTAL HC&FC REJECT
11
Units
H&F REJECTION %
7.48%
of total production
NDT REJECTION %
3.40%
of total production
| No | Observation | Status |
| 1 |
SWM 2 Heat Exhaust Duct Overheated |
High Risk |
| 2 |
Heat Stress During Metal transfer by forklift due to no AC |
Medium Risk |
| 3 |
Heat Stress in Die Maintenance Workshop |
Medium Risk |
| Furnace |
Mass Received (Ton) |
Consumed (Ton) |
Metal Added (Ton) |
Mass End of Shift (Ton) |
Remarks |
| HA
min: 28T
|
25,450.00 |
-6,000.00 |
0.00 |
31,450.00 |
โ |
| HC
min: 24T
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM1
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM2
|
33,400.00 |
5,500.00 |
0.00 |
27,900.00 |
โ |
| Stage | Condition | Comments |
| Received |
Bad |
Blocked |
| Hand Over |
Bad |
Still Blocked, metal removed up to take tapping from HA |
| M/C No. |
Status |
Mold Type |
NDT OK |
HC & FC Reject |
NDT Reject |
Total |
Rejection % |
H&F Rej % |
NDT Rej % |
Remarks |
| 6 |
Stopped |
640-17" |
66 |
6 |
1 |
73 |
9.6% |
8.2% |
1.4% |
Stop Due to metal feeding |
| 17 |
Stopped |
SMX201-22"-M6 |
65 |
5 |
4 |
74 |
12.2% |
6.8% |
5.4% |
Stop due to metal feeding |
| TOTAL PRODUCTION |
147 |
โ | โ | โ | โ |
| TOTAL REJECTION |
16 |
10.9% |
7.5% |
3.4% |
โ |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
| SWM 2 ME |
Brake issue |
0 min |
Reported |
NA |
Maintenance |
โ |
โ |
| Forklift D2 |
AC issue |
0 min |
Reported |
NA |
Maintenance |
โ |
โ |
| Die Model | Status | Remarks |
| 640-16" |
Completed |
โ |
| SMX201-22 |
โ |
โ |