๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-07-30
Day โ€” Team B
TOTAL NDT OK
401
Units
TOTAL HC&FC REJECT
30
Units
H&F REJECTION %
6.67%
of total production
NDT REJECTION %
4.22%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-30
Shift:
Day
Supervisor:
Mohammed
Team:
B
Total Attendance:
15
Total Absent:
6
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
3
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 The work site is dirty Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
16.00
โš  Below minimum
16.00 0.00 0.00 โ€”
HC
min: 24T
22.60
โš  Below minimum
18.80 0.00 3.80 โ€”
SWM1 28.00 32.30 0.00 -4.30 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17. M2 85 5 3 93 8.6% 5.4% 3.2% โ€”
5 Running CV98-20. M2 64 5 0 69 7.3% 7.3% 0.0% โ€”
14 Stopped 640-16 M1 74 8 7 89 16.9% 9.0% 7.9% โ€”
15 Running 640-17 M1 78 7 4 89 12.4% 7.9% 4.5% โ€”
16 Running 640-16 M2 100 5 5 110 9.1% 4.6% 4.6% โ€”
TOTAL PRODUCTION 450 โ€”โ€”โ€”โ€”
TOTAL REJECTION 49 10.9% 6.7% 4.2% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
โœ๏ธ Start a New Report