Day โ€” Team B
TOTAL NDT OK
425
Units
TOTAL HC&FC REJECT
36
Units
H&F REJECTION %
7.44%
of total production
NDT REJECTION %
4.75%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-31
Shift:
Day
Supervisor:
Mohammed Al roshdi
Team:
B
Total Attendance:
11
Total Absent:
10
Was the Lean Meeting conducted?:
No
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Change safety wire for machine Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
16.00
โš  Below minimum
16.00 0.00 0.00 โ€”
HC
min: 24T
19.60
โš  Below minimum
22.60 0.00 -3.00 โ€”
SWM1 30.00 25.00 0.00 5.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 M2 90 6 6 102 11.8% 5.9% 5.9% โ€”
5 Running Cv98-20 59 5 3 67 11.9% 7.5% 4.5% โ€”
6 Running Smx201-22 M5 34 7 1 42 19.1% 16.7% 2.4% โ€”
14 Running 640-16 M1 62 7 3 72 13.9% 9.7% 4.2% โ€”
15 Running 640-17 M1 90 5 3 98 8.2% 5.1% 3.1% โ€”
16 Running 640-16 M2 90 6 7 103 12.6% 5.8% 6.8% โ€”
TOTAL PRODUCTION 484 โ€”โ€”โ€”โ€”
TOTAL REJECTION 59 12.2% 7.4% 4.8% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-15 m1 5H Completed โ€”
๐Ÿ“
ADDITIONAL REMARKS

Forklift D1 needs to deep maintenance , because the radiator very dirty .. All selected molde have been moved outside the die maintenance

โœ๏ธ Start a New Report