GENERAL INFORMATION
Date:
2026-08-02
Shift:
Night
Supervisor:
Mohammed Al roshdi
Team:
B
Total Attendance:
14
Total Absent:
7
Was the Lean Meeting conducted?:
No
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
16.70
โš  Below minimum
14.90 0.00 1.80 โ€”
SWM1 30.00 32.80 0.00 -2.80 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running CV40-22 26 6 3 35 25.7% 17.1% 8.6% โ€”
5 Running CV98-20 67 5 2 74 9.5% 6.8% 2.7% โ€”
6 Running SMX201-22 M6 48 7 3 58 17.2% 12.1% 5.2% โ€”
14 Running 640-15 5H 76 7 6 89 14.6% 7.9% 6.7% โ€”
15 Running 640-17 M2 34 5 1 40 15.0% 12.5% 2.5% โ€”
16 Running 640-16 M2 71 5 9 85 16.5% 5.9% 10.6% โ€”
TOTAL PRODUCTION 381 โ€”โ€”โ€”โ€”
TOTAL REJECTION 59 15.5% 9.2% 6.3% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
โœ๏ธ Start a New Report