๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-03
Night โ€” Team C
TOTAL NDT OK
202
Units
TOTAL HC&FC REJECT
29
Units
H&F REJECTION %
11.42%
of total production
NDT REJECTION %
9.06%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-03
Shift:
Night
Supervisor:
Al Julanda
Team:
C
Total Attendance:
4
Total Absent:
0
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
2
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
28.30 9.30 0.00 19.00 โ€”
SWM1 21.00 0.00 11.83 32.83 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received โ€” โ€”
Hand Over โ€” โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running cv40 0 0 1 1 100.0% 0.0% 100.0% โ€”
5 Running cv98 36 7 11 54 33.3% 13.0% 20.4% โ€”
6 Running a22 23 5 3 31 25.8% 16.1% 9.7% โ€”
14 DCO 640-15 2 4 4 10 80.0% 40.0% 40.0% โ€”
15 Running 640-17 69 6 1 76 9.2% 7.9% 1.3% โ€”
16 Running 640-16'' 72 7 3 82 12.2% 8.5% 3.7% โ€”
TOTAL PRODUCTION 254 โ€”โ€”โ€”โ€”
TOTAL REJECTION 52 20.5% 11.4% 9.1% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
โœ๏ธ Start a New Report