Report #93 โ Submitted 2026-08-05 07:09:27
| No | Observation | Status |
|---|---|---|
| โ No observations recorded โ | ||
| Furnace | Mass Received (Ton) | Consumed (Ton) | Metal Added (Ton) | Mass End of Shift (Ton) | Remarks |
|---|---|---|---|---|---|
| HA
min: 28T
|
0.00 | 0.00 | 0.00 | 0.00 | โ |
| HC
min: 24T
|
19.00 โ Below minimum
|
11.50 | 11.00 | 18.50 | โ |
| SWM1 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| SWM2 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| Stage | Condition | Comments |
|---|---|---|
| Received | Acceptable | HA to SWM2 bad ( metal solidify) |
| Hand Over | Acceptable | HA to SWM2 bad ( metal solidify) |
| M/C No. | Status | Mold Type | NDT OK | HC & FC Reject | NDT Reject | Total | Rejection % | H&F Rej % | NDT Rej % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 4 | Running | CV40-22 | 49 | 7 | 5 | 61 | 19.7% | 11.5% | 8.2% | โ |
| 5 | Running | CV41-22 | 70 | 4 | 0 | 74 | 5.4% | 5.4% | 0.0% | โ |
| 6 | Running | SMX201-22 | 58 | 8 | 9 | 75 | 22.7% | 10.7% | 12.0% | โ |
| 14 | Stopped | 640-16 M2 | 0 | 6 | 11 | 17 | 100.0% | 35.3% | 64.7% | stopped no feedback due to L.M issues |
| 15 | Running | 640-17 | 77 | 4 | 0 | 81 | 4.9% | 4.9% | 0.0% | โ |
| 16 | Running | 640-16 | 87 | 4 | 5 | 96 | 9.4% | 4.2% | 5.2% | โ |
| TOTAL PRODUCTION | 404 | โ | โ | โ | โ | |||||
| TOTAL REJECTION | 63 | 15.6% | 8.2% | 7.4% | โ | |||||
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
|---|---|---|---|---|---|---|---|
| โ No breakdowns recorded โ | |||||||
| Die Model | Status | Remarks |
|---|---|---|
| 640-15'' | Not Completed | injector stuck on upper mold |
| CV98 | Not Completed | lower mold pending |
started shift with issues with Laser marking machines, due to this we were unable to control rej. Mc 14 started and stopped because of this