Date & Shift
2026-08-05
Night โ€” Team D
TOTAL NDT OK
353
Units
TOTAL HC&FC REJECT
25
Units
H&F REJECTION %
6.27%
of total production
NDT REJECTION %
5.26%
of total production
DOWNTIME (min)
60
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-05
Shift:
Night
Supervisor:
Saud
Team:
D
Total Attendance:
10
Total Absent:
6
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
6
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 D2 brakes not working well Medium Risk
2 Casting dec not organised Low Risk
3 DM spot not cleaning Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
19.38
โš  Below minimum
9.26 7.90 18.02 โ€”
SWM1 26.70 7.63 9.26 28.33 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good Cleaned
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running CV98-20 30 3 4 37 18.9% 8.1% 10.8% โ€”
6 Running SMX201-22 m7 48 8 7 63 23.8% 12.7% 11.1% โ€”
14 Running 640-16 m2 90 6 6 102 11.8% 5.9% 5.9% โ€”
15 Running 640-17 m2 85 4 0 89 4.5% 4.5% 0.0% โ€”
16 Running 640-16 m1 100 4 4 108 7.4% 3.7% 3.7% โ€”
TOTAL PRODUCTION 399 โ€”โ€”โ€”โ€”
TOTAL REJECTION 46 11.5% 6.3% 5.3% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 4 ๐Ÿ”ผ Machines Handed Over: 5
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
LPDC4 Heater fault 60 min Rectified MA Maintenance Closed โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
CA90-22 m1 Completed โ€”
SMX211-24 Not Completed Upper mold -change date
๐Ÿ“
ADDITIONAL REMARKS

We were able to feeding 5 machines throughout the work with the necessary metal required by using one driver forklift

โœ๏ธ Start a New Report