๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-06
Night โ€” Team D
TOTAL NDT OK
236
Units
TOTAL HC&FC REJECT
21
Units
H&F REJECTION %
7.50%
of total production
NDT REJECTION %
8.21%
of total production
DOWNTIME (min)
330
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-06
Shift:
Night
Supervisor:
Saud
Team:
D
Total Attendance:
11
Total Absent:
5
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
5
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Moor Coolant on the melting floor High Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
21.90
โš  Below minimum
14.00 0.00 7.90 โ€”
SWM1 22.00 7.33 0.00 14.67 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
5 Running CV41-22 75 4 3 82 8.5% 4.9% 3.7% โ€”
6 Running SMX201-22m7 8 1 5 14 42.9% 7.1% 35.7% โ€”
6 Running CA90-22 28 4 2 34 17.7% 11.8% 5.9% โ€”
15 Running 640-17m2 28 4 6 38 26.3% 10.5% 15.8% โ€”
15 Running 640-15m1 5 2 2 9 44.4% 22.2% 22.2% โ€”
16 Running 640-16 m1 92 6 5 103 10.7% 5.8% 4.9% โ€”
TOTAL PRODUCTION 280 โ€”โ€”โ€”โ€”
TOTAL REJECTION 44 15.7% 7.5% 8.2% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 4 ๐Ÿ”ผ Machines Handed Over: 4
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
SWM1 Idex dempers not working 330 min Rectified MA Maintenance Closed โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
CV40-22 Completed โ€”
๐Ÿ“
ADDITIONAL REMARKS

Idex working well

โœ๏ธ Start a New Report