๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-11-06
Day โ€” Team C
TOTAL NDT OK
171
Units
TOTAL HC&FC REJECT
13
Units
H&F REJECTION %
6.91%
of total production
NDT REJECTION %
2.13%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-11-06
Shift:
Day
Supervisor:
Al Julanda
Team:
C
Total Attendance:
15
Total Absent:
1
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
2
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
13.80
โš  Below minimum
4.16 8.20 17.84 โ€”
SWM1 28.60 8.20 6.78 27.18 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running 666-17 24 3 0 27 11.1% 11.1% 0.0% โ€”
7 Stopped R69-17 3 1 3 7 57.1% 14.3% 42.9% โ€”
7 Running R62-19 54 4 1 59 8.5% 6.8% 1.7% โ€”
17 Stopped R62-18 45 2 0 47 4.3% 4.3% 0.0% โ€”
17 Running R62-17 45 3 0 48 6.3% 6.3% 0.0% โ€”
TOTAL PRODUCTION 188 โ€”โ€”โ€”โ€”
TOTAL REJECTION 17 9.0% 6.9% 2.1% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
666-17 Completed lower mold only
R79 Completed โ€”
โœ๏ธ Start a New Report