Report #68 โ Submitted 2026-07-24 07:48:35
| No | Observation | Status |
|---|---|---|
| 1 | Pipe water leak LPDC 7 | Medium Risk |
| 2 | Safety wire removed from LPDC 16 | Medium Risk |
| 3 | Dross pin in casting not good for use | Low Risk |
| Furnace | Mass Received (Ton) | Consumed (Ton) | Metal Added (Ton) | Mass End of Shift (Ton) | Remarks |
|---|---|---|---|---|---|
| HA
min: 28T
|
23.00 โ Below minimum
|
9.40 | 27.00 | 40.60 | โ |
| HC
min: 24T
|
16.00 โ Below minimum
|
7.00 | 13.00 | 22.00 | โ |
| SWM1 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| SWM2 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| Stage | Condition | Comments |
|---|---|---|
| Received | Acceptable | โ |
| Hand Over | Acceptable | โ |
| M/C No. | Status | Mold Type | NDT OK | HC & FC Reject | NDT Reject | Total | Rejection % | H&F Rej % | NDT Rej % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 4 | Running | Smx201-22 M7 | 57 | 7 | 7 | 71 | 19.7% | 9.9% | 9.9% | โ |
| 6 | Running | Vision 640-17 M1 | 80 | 8 | 6 | 94 | 14.9% | 8.5% | 6.4% | โ |
| 7 | Running | Vision 640-17 M2 | 58 | 6 | 1 | 65 | 10.8% | 9.2% | 1.5% | Breadown from 1:20 am to 3:15 am furnace sensor problem and heater |
| 15 | Running | Vision 640-15 M1 | 56 | 12 | 16 | 84 | 33.3% | 14.3% | 19.1% | Breakdown conveyor problem 2 hours |
| 16 | Running | Vision 640-16 M1 | 58 | 14 | 8 | 80 | 27.5% | 17.5% | 10.0% | Breakdown |
| TOTAL PRODUCTION | 394 | โ | โ | โ | โ | |||||
| TOTAL REJECTION | 85 | 21.6% | 11.9% | 9.6% | โ | |||||
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
|---|---|---|---|---|---|---|---|
| โ No breakdowns recorded โ | |||||||
| Die Model | Status | Remarks |
|---|---|---|
| 640-16 M2 | Completed | โ |