๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-07-25
Day โ€” Team C
TOTAL NDT OK
443
Units
TOTAL HC&FC REJECT
25
Units
H&F REJECTION %
5.18%
of total production
NDT REJECTION %
3.11%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-25
Shift:
Day
Supervisor:
Al Julanda
Team:
C
Total Attendance:
14
Total Absent:
5
Was the Lean Meeting conducted?:
No
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 metal splash to forklift operator while charging wheel to HA furnace High Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
18.90
โš  Below minimum
8.05 10.40 21.25 โ€”
HC
min: 24T
19.55
โš  Below minimum
10.50 8.05 17.10 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable HA to SWM2 bad ( metal solidify)
Hand Over Acceptable HA to SWM2 bad ( metal solidify)
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running cv98-20 65 4 1 70 7.1% 5.7% 1.4% โ€”
6 Stopped 640-17 15 0 0 15 0.0% 0.0% 0.0% โ€”
7 Running 640-17 94 4 1 99 5.1% 4.0% 1.0% โ€”
14 Running 640-16 100 4 1 105 4.8% 3.8% 1.0% โ€”
15 Running 640-15 85 5 7 97 12.4% 5.2% 7.2% โ€”
16 Running 640-16'' 84 8 5 97 13.4% 8.3% 5.2% โ€”
TOTAL PRODUCTION 483 โ€”โ€”โ€”โ€”
TOTAL REJECTION 40 8.3% 5.2% 3.1% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
๐Ÿ“
ADDITIONAL REMARKS

metal delays due to temperature variation in degassing area