๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-07-25
Night โ€” Team B
TOTAL NDT OK
474
Units
TOTAL HC&FC REJECT
32
Units
H&F REJECTION %
6.08%
of total production
NDT REJECTION %
3.80%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-25
Shift:
Night
Supervisor:
Mohammed Al roshdi
Team:
B
Total Attendance:
16
Total Absent:
4
Was the Lean Meeting conducted?:
No
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 The office floors are wet due to the humidity. Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
20,100.00 21,190.00 0.00 -1,090.00 โ€”
HC
min: 24T
17,100.00 14,720.00 0.00 2,380.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running Cv98-20 M2 65 4 2 71 8.5% 5.6% 2.8% โ€”
6 Running 640-17 M1 47 7 5 59 20.3% 11.9% 8.5% โ€”
7 Running 640-17 M2 85 5 2 92 7.6% 5.4% 2.2% โ€”
14 Running 640-16 m2 93 4 3 100 7.0% 4.0% 3.0% โ€”
15 Running 640-15 4H 90 5 5 100 10.0% 5.0% 5.0% โ€”
16 Running 640-17 M1 94 7 3 104 9.6% 6.7% 2.9% โ€”
TOTAL PRODUCTION 526 โ€”โ€”โ€”โ€”
TOTAL REJECTION 52 9.9% 6.1% 3.8% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
SMX201-22 M5 Completed โ€”
โœ๏ธ Start a New Report