๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-07-15
Day โ€” Team B
TOTAL NDT OK
274
Units
TOTAL HC&FC REJECT
31
Units
H&F REJECTION %
9.51%
of total production
NDT REJECTION %
6.44%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-07-15
Shift:
Day
Supervisor:
OMAR
Team:
B
Total Attendance:
14
Total Absent:
6
Was the Lean Meeting conducted?:
No
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
23.40
โš  Below minimum
0.00 0.00 23.40 โ€”
HC
min: 24T
21.24
โš  Below minimum
0.00 0.00 21.24 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17"-M1 55 7 6 68 19.1% 10.3% 8.8% โ€”
6 Running 640-17"-M2 90 5 2 97 7.2% 5.2% 2.1% โ€”
7 Running BORO 18" 36 6 2 44 18.2% 13.6% 4.6% โ€”
14 Running R69-18"-ET-25-35 64 6 2 72 11.1% 8.3% 2.8% โ€”
16 Running R62-18"-45.52 29 7 9 45 35.6% 15.6% 20.0% โ€”
TOTAL PRODUCTION 326 โ€”โ€”โ€”โ€”
TOTAL REJECTION 52 16.0% 9.5% 6.4% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
๐Ÿ“
ADDITIONAL REMARKS

Starting 4 machines, in total 5 machines.

โœ๏ธ Start a New Report