๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-02
Day โ€” Team C
TOTAL NDT OK
227
Units
TOTAL HC&FC REJECT
21
Units
H&F REJECTION %
7.84%
of total production
NDT REJECTION %
7.46%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-02
Shift:
Day
Supervisor:
Al Julanda
Team:
C
Total Attendance:
14
Total Absent:
4
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
2
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 air leak sprue drilling 3 Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
20.09
โš  Below minimum
7.15 7.30 20.24 โ€”
SWM1 28.40 7.30 9.38 30.48 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable HA to SWM2 bad ( metal solidify)
Hand Over Acceptable HA to SWM2 bad ( metal solidify)
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
5 Running cv98-20 69 4 1 74 6.8% 5.4% 1.4% โ€”
14 Running 640-15 9 5 4 18 50.0% 27.8% 22.2% โ€”
15 Stopped 640-17 68 6 10 84 19.1% 7.1% 11.9% more rejection stopped
16 Running 640-16 81 6 5 92 12.0% 6.5% 5.4% โ€”
TOTAL PRODUCTION 268 โ€”โ€”โ€”โ€”
TOTAL REJECTION 41 15.3% 7.8% 7.5% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640.17 Completed โ€”
201-22 Completed lower mold only
โœ๏ธ Start a New Report