Report #86 โ Submitted 2026-08-02 19:03:53
| No | Observation | Status |
|---|---|---|
| 1 | air leak sprue drilling 3 | Low Risk |
| Furnace | Mass Received (Ton) | Consumed (Ton) | Metal Added (Ton) | Mass End of Shift (Ton) | Remarks |
|---|---|---|---|---|---|
| HA
min: 28T
|
0.00 | 0.00 | 0.00 | 0.00 | โ |
| HC
min: 24T
|
20.09 โ Below minimum
|
7.15 | 7.30 | 20.24 | โ |
| SWM1 | 28.40 | 7.30 | 9.38 | 30.48 | โ |
| SWM2 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| Stage | Condition | Comments |
|---|---|---|
| Received | Acceptable | HA to SWM2 bad ( metal solidify) |
| Hand Over | Acceptable | HA to SWM2 bad ( metal solidify) |
| M/C No. | Status | Mold Type | NDT OK | HC & FC Reject | NDT Reject | Total | Rejection % | H&F Rej % | NDT Rej % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 5 | Running | cv98-20 | 69 | 4 | 1 | 74 | 6.8% | 5.4% | 1.4% | โ |
| 14 | Running | 640-15 | 9 | 5 | 4 | 18 | 50.0% | 27.8% | 22.2% | โ |
| 15 | Stopped | 640-17 | 68 | 6 | 10 | 84 | 19.1% | 7.1% | 11.9% | more rejection stopped |
| 16 | Running | 640-16 | 81 | 6 | 5 | 92 | 12.0% | 6.5% | 5.4% | โ |
| TOTAL PRODUCTION | 268 | โ | โ | โ | โ | |||||
| TOTAL REJECTION | 41 | 15.3% | 7.8% | 7.5% | โ | |||||
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
|---|---|---|---|---|---|---|---|
| โ No breakdowns recorded โ | |||||||
| Die Model | Status | Remarks |
|---|---|---|
| 640.17 | Completed | โ |
| 201-22 | Completed | lower mold only |